- Finish pasture sheds (screw loose siding panels).
- Plant cover crop.
- Clean junk along corral.
- Run a load to the waste disposal facility.
- Get a bid on a roof deck and deck beam repair.
- Stain the deck.
- Add forced ventilation to compost (similar to Cedar Groove system).
- Clean up garage.
- Sheetrock garage.
- Build shelves and greenhouse window in garage South wall.
- Remove old electric water heater. Install solar tank. Install new electric water heater.
- Winterize beehives.
Thursday, September 6, 2012
TO-DO Before end of 2012
Subscribe to:
Post Comments (Atom)
September 17, 2012 update.
ReplyDeleteSome cover crop planted (one full bed, field peas).
Junk along corral cleaned except one heavy item.
Deck stained, second coat needed in some spots.
Forced ventilation done on compost.
4 out of 12 items at least partially completed.
About 20% overall completion.
September 30 update:
ReplyDelete1, 4, 9, 10, 11, 12 not started.
2 is done on 2 beds (peas) and half a row (vetch).
3 and 6 are completed.
5 is half done, deck beam is fixed.
7 is done on 2 compost piles, the second pile still needs a fan. The third pile will be non ventilated.
8 is done on half the garage.